Installation and operating manual
EN
14 DRYPOINT
®
AC 410 – 495 | DRYPOINT
®
AC 410 – 495 MS
1.5.1. Warranty and liability
All warranty and liability for injury or damage to property shall be voided, if it is caused by:
• Improper use of the plant
• Incorrect installation, start-up, operation and maintenance of the plant
• Operation of the plant while it is obviously defective
• Non-compliance with the instructions in this document regarding transport, storage, installation, start-up and
maintenance of the plant
•
Unauthorised modifications to the plant
•
Insufficient inspection or monitoring of plant components that are subject to wear
• Incorrectly performed repairs
• Use of third-party components
Please also observe the general warranty terms and conditions of the manufacturer.
1.5.2. Duties of the plant operator
The plant operator must ensure that the plant is commissioned by personnel who are familiar with the relevant
safety instructions and trained in the operation of the plant. The instructions include in particular:
1.5.2.1. Safety
• Accident prevent regulations
•
General and plant-specific safety instructions
• Safety devices of the plant
• Emergency procedures
1.5.2.2. Plant operation
• Proper procedures for plant commissioning and start-up
• Emergency procedures
• Plant shut-down
1.5.3. Duties of personnel
All persons who are involved in the operation of the plant must
• comply with the general occupational safety and accident prevention
• regulations and must have read the installation and operating manual.
• All instructions in this document must be strictly adhered to.
2. Product information
2.1. Scope of delivery
Figure
Description
DRYPOINT
®
AC, complete
Содержание DRYPOINT AC 410
Страница 2: ...Installation and operating manual EN 2 DRYPOINT AC 410 495 DRYPOINT AC 410 495 MS ...
Страница 52: ...Installation and operating manual EN 52 DRYPOINT AC 410 495 DRYPOINT AC 410 495 MS ...
Страница 55: ...EN Installation and operating manual DRYPOINT AC 410 495 DRYPOINT AC 410 495 MS 55 ...