Page 2-4
Bacharach, Inc.
Instructions 67-9319
INSTALLATION
INJECTOR CALIBRATOR CD3
Figure 2-9. Calibration Fluid Dipstick
Figure 2-10. Checking Cambox
Figure 2-11. Initial Checks - Hookup
Flowmeter Transducer
8. The flowmeter transducer reservoir is filled at
the factory before shipping. If additional fluid is
required, see Section 2.6.
2.5 Pre-operation Checks
Before trying to operate the calibrator for the first
time be sure to complete all the initial checks and
start-up procedures given in Section 2.6.
CAUTION
CALIBRATOR CAN BE DAMAGED. Do not
operate the calibrator until all items on the
check list in Section 2.6 have
YES
re-
sponses.
2.6 Initial Checks
Before operating the calibrator for the first time
after installation, complete the following checklist.
ALL RESPONSES SHOULD BE
“YES”.
PRE-OPERATION CHECKLIST
CONDITION
YES
NO
_______________________________________________
1. The On/Off Switch is in the
_____ _____
OFF position.
2. The electrical power supplied _____ _____*
corresponds to the data on the
nameplate inside the left side
door (See Section 2.3).
5 Cambox Plug
2 Fill to "F" Mark on Dipstick
6 Fill Cambox to 3-3/4 Inches fromTop
3 AIR IN
4 WATER IN
1 On/Off Switch
5 WATER OUT
2 Electrical Power Inlet
(terminal connections
inside left door)
2 Electrical Nameplate
(inside)
Содержание 67-7622
Страница 26: ...Page 2 8 Bacharach Inc Instructions 67 9319 INSTALLATION INJECTOR CALIBRATOR CD3 NOTES ...
Страница 54: ...Page 3 28 Bacharach Inc Instructions 67 9319 OPERATION INJECTOR CALIBRATOR CD3 NOTES ...
Страница 68: ...Page 4 14 Bacharach Inc Instructions 67 9319 MAINTENANCE AND TROUBLESHOOTING INJECTOR CALIBRATOR CD3 NOTES ...
Страница 96: ...Page A 2 Bacharach Inc Instructions 67 9319 APPENDIX INJECTOR CALIBRATOR CD3 NOTES ...