TD- Documentation
Page 62 of 68 219-100-0-0-1.0.doc
Mounting Instruction
Chain drive KSA xxx-24 V / 230V
Electrical connection
Color
IEC 757
BLACK BK
WHITE WH
BROWN BN
BLUE BU
GREEN / YELLOW GN/YE
GREEN GN
VIOLETT VT
GREY GY
according
to
Wire color / indication
230 V AC
Version (KSA2) S2
(With integrated disconnection)
BK
BU
Version (KSA/KSA2) MP
(With integrated programmable
microprocessor)
PVC cable
6 x 0,75mm²
Version
MP
(for Tandem)
(for tandem- or triple-
operation on casement)
Programming device “UNI”
Ord. no. 524186...device
Ord. no. 524131...parameteris. cable
*
*
only for special application
(as synchronized tandem operation)
OPEN
CLOSED
Running direct. Pole reversal
+
+
-
-
BN
GY
WH
*
only for special application
(as synchronized tandem operation)
BN
BK
WH
connect
Master
Slave 1 ... 2
24 V DC
Version (KSA2) S2
(With integrated disconnection)
BN
BU
Version (KSA/KSA2) MP
(With integrated programmable
microprocessor)
Silicone cable
FRNC- SIHSI FE90
5 x 0,5mm²
Version (for Tandem)
MP
(for tandem- or triple-
operation on casement)
*
*
only for special application
(as synchronized tandem operation)
+
+
-
-
BU
BN
+
+
-
-
BU
BN
GN
VT
WH
24 V DC
BN
BU
Silicone cable
FRNC- SIHSI FE90
5 x 0,5mm²
*
GN
VT
WH
*
only for special application
(as synchronized tandem operation)
24 V DC
BN
BU
GN
VT
WH
connect
- +
+
-
Master
Slave 1 .... 2
24
V
D
C
c
o
n
nec
ti
on
GN
VT
*
GN/VT insulate
(or monitoring contact -Version Z)
*
*
GN
VT
Version :
contact
Z
max. 24 V, 500 mA
(min. 10 mA)
230 V AC
230 V AC
open close
BK
BN
L
GN/YE
BK
BU
PVC cable
6 x 0,75mm²
*
BN
GY
WH
GY
WH
Version :
contact
Z
max. 24 V, 500 mA
(min. 10 mA)
open close
BK
BN
L
Closer
GN/YE
BU
GY
GN/YE
N
L-ZU
L-AUF
PE
*
*
24V DC
230V AC
!
ATTENTION
for synchronized drives
Master
Slave 1
Slave 2
For tandem and tridem operation,
the drives are always delivered as
a
and must be installed as a
master and slave set !
- See specifications on drive label
set
Attention ! Electric shock!
Make sure that no 230V line voltage is live on terminals during the drive connection !
- Note: Switch off the operation voltage after ca. 3 min. in order to save energy (accord. regulations of Euro ACE)
only for authorized personnel !
- Programming of the drives is
accomplished at the factory !
On-site programming as an extension
only in accord. with instructions of the
progr. device and by specially trained
and authorized personnel !
Note:
Unused leads must be insulated!
- Note general safety instructions on pages 6 and 24-26 (line routing).
only for 24V DC drives
no CLOSE-contact possible
24
Make appropriate connections, depending on the drive version.
Note: The running direction of the drive can be changed by reversing (reversion of polarity) the
„
BN – (brown)
“ - „
BU – (blue)
“
leads.