When mounting actuator controls outside the flooded area but below water
level, we recommend using the DS intermediate double sealed frame between
wall bracket and plug/socket connector.
●
For LSW 69 cable set, the plug/socket connector must be opened at wall
bracket level and the cables must be connected to the pin carrier according to
the terminal plan. Appropriate crimping pliers are required for orderly crimping.
Suitable pliers are available at AUMA (art. no. K007.979).
Figure 15: Connection using LSW 69
[1]
Cover for wall bracket plug/socket connector
[2]
Pin carrier for crimp pin contacts
[3]
Pin contacts (included in LSW 69 scope of delivery)
Table 12:
Calibration pin
Ø
[mm]
Crimp range
Pcs
Pin contacts for
Art. no.
2.00
2.50
3
Motor cables
Z030.022
1,60
0.75 – 1.5
8
Control contacts of hybrid cable
Z006.161-1
0.5 – 0.55
0.5 – 0.55
4
CAN contacts of hybrid cable
Z041.602
-
When connecting, make sure that the shield of both connecting cables is
sufficiently overlapping (approx. 2 mm over the O-ring) the contact socket
of the cable gland.
-
Connect all protective earth wires to the protective earthing (symbol )
of housing cover using ring lugs.
19
SA 07.2-UW – SA 16.2-UW / SAR 07.2-UW – SAR 16.2-UW Control unit: electronic (MWG)
AC 01.2 Non-Intrusive Profinet
Electrical connection