Filling the system
The central heating installation needs
WREH¿OOHGZLWKSRWDEOHZDWHUDFFRUGLQJ
to the requirements in chapter ‘Water
TXDOLW\¶:KHQWKHERLOHUKDVEHHQ
electrically commissioned, then the
KHDWLQJV\VWHPFDQEH¿OOHG)RU¿OOLQJ
or topping up the installation use the
following procedure:
/HDYHWKHSRZHURQWKHERLOHU
&RQQHFWD¿OOLQJWDSWRWKHUHWXUQ
of the hydraulic circuit and open it.
3.
Connect a hose on the manual
deaerator (A) and open it to
remove the air.
4.
Close the manual deaerator
when water is constantly coming
out from it.
6ORZO\¿OOWKHFHQWUDOKHDWLQJ
V\VWHPXSWR±EDU'LJLWDO
pressure reading is shown in the
middle of the Home screen.
&ORVHWKH¿OOLQJWDS
7.
Vent the entire heating installation
starting at the lowest point.
&KHFNWKHZDWHUSUHVVXUHDQGWRS
XSLIQHFHVVDU\WR±EDU
'LVFRQQHFWWKH¿OOLQJKRVHIURPWKH
hydraulic circuit.
:KHQSRZHULQJXSWKHERLOHUDQ
automatic air purge program will run
WRYHQWWKHERLOHUµ$LUSXUJHDFWLYH¶
This will last for approximately 7
minutes. During this program the
pressure in the central heating needs
WREHFKHFNHGDQGZKHQQHFHVVDU\
topped up again.
It may take some time before all
the air has disappeared from a
¿OOHGLQVWDOODWLRQ&HUWDLQO\GXULQJ
WKH¿UVWZHHNQRLVHPD\EHKHDUG
that indicate air. The automatic air
vent (B) in the boiler will let this air
HVFDSHFDXVLQJWKHZDWHUSUHVVXUH
to drop during this period and the
water pressure needs topping up
again.
Hot water supply
)LOOWKHKRWZDWHUVXSSO\E\RSHQLQJWKH
cold mains isolation valve.
%OHHGWKHKRWZDWHULQVWDOODWLRQE\
opening all hot water taps one at a
time. Leave the water running until all
air has disappeared from the supply.
Flush with a minimum of 10 litres to
rinse any residual contaminants from
the hot supply.