30
Installation
Condensate connection
Condensate connection
For every m
3
of natural gas that is
EXUQHGEHWZHHQDQGOLWUHVRI
water can accumulate, due to a very
KLJKHQHUJ\HႈFLHQF\&RQGHQVDWH
ZKLFKDFFXPXODWHVLQWKHERLOHULQ
WKHÀXHJDVSLSHRULQWKHFKLPQH\
PXVWEHGUDLQHGWRWKHSXEOLFVHZDJH
system.
,QWKLVUHJDUGFRXQWU\VSHFL¿F
UHJXODWLRQVPXVWEHWDNHQLQWRDFFRXQW
A neutralization of the condensate may
EHUHTXLUHG,WPXVWEHSRVVLEOHIRU
WKHFRQGHQVDWHWRYLVLEO\GUDLQLQWRD
funnel-siphon (2) at the installation site.
$¿[HGFRQQHFWLRQWRWKHSXEOLFVHZHU
system is not permitted.
For condensate drainage, only
FRUURVLRQUHVLVWDQWDQGFHUWL¿HG
PDWHULDOVPD\EHXVHG7KHGUDLQDJH
PXVWEHFDUULHGRXWLQDIURVWIUHH
space. The drainage pipe should have
DVORSHVRDVWRDYRLGDEDFNZDVKRI
the condensate.
Filling of the siphon
%HIRUHWKHERLOHULVWDNHQLQWR
RSHUDWLRQWKHEXLOGLQVLSKRQ
PXVWEH¿OOHGZLWKZDWHUVRDVWR
prevent an emission of waste gas from
the condensate connection. Filling
LVFDUULHGRXWPRVWHDVLO\E\SRXULQJ
approximately 0.5 litres of water into
WKHÀXHJDVSLSH
2QFHHDFK\HDUWKHÀXHJDV
FRQQHFWLRQVKDYHWREHFKHFNHGIRU
OHDNSURRIQHVVDQGWKHVLSKRQ¿OOHG
with water.
$OO3/86ÀRRUVWDQGLQJJDV¿UHG
FRQGHQVLQJERLOHUVFRQWDLQDVLSKRQLF
condensate trap to collect and release
condensate.
The amount of condensate formed is
GHWHUPLQHGE\WKHW\SHRIERLOHUVDQG
WKHZDWHUWHPSHUDWXUHSURGXFHGE\WKH
ERLOHU
Condensate pipework.
3UHVVWKHVXSSOLHGSODVWLFULEERQ
WXEHRQWRWKHFRQGHQVDWHGUDLQDWWKH
ERWWRPRIWKHERLOHU&RQQHFWWKHWXEH
to the main condensate drain (minimum
GLDPHWHU PPE\PHDQVRIDQRSHQ
connection to avoid sewage gasses
FRPLQJLQWRWKHERLOHU
Fit a pipe for the condensate drain
EHKLQGWKHK\GUDXOLFV\VWHP)RUWKDW
SXUSRVHWKHORZHUEUDFNHWVKDYH
holes allowing the installation of a PVC
drain of ø40mm max. Use this drain
to connect the individual condensate
GUDLQVRIHDFKERLOHU
7KHVLSKRQRIDÀXHJDVV\VWHPFDQ
DOVREHFRQQHFWHGLIUHTXLUHGE\
means of an open connection.
HAZARD:
Danger of death due to
poisoning! If the siphon is
QRW¿OOHGZLWKZDWHURULIDQ\
connections are open, then escaping
waste gas can pose a hazard of
death for people.
3
1
2