82
25/03/19 09:00
–10°
1.5 bar
CH Pump Overrun
1
2
T10
BMS
32°
Commissioning
Flue gas analysis
Full load (Step 1/3)
Legend
0HDVXULQJSRLQWIRUWKHÀXHJDV
SUREH
Step 1: Check on full load
Step 2: Check on low load
Step 3: Adjustment (if necessary).
Step 1: O
2
/ CO
2
check on full load
The O
2
or CO
2
setting is preset at the
factory to E, namely natural gas, for all
HTXLSPHQWXQLWV$FDOLEUDWHG2
2
or CO
2
FRQWUROPHDVXUHPHQWPXVWEHFDUULHG
out during commissioning.
(QVXUHWKDWWKHERLOHULVLQ
operation and that the heat, which
LWSURGXFHVFDQEHGLVFKDUJHG
Set the load of each engine
3UHVVWKHFKLPQH\VZHHSEXWWRQIRU
VHFRQGV
-
Select with
“+”
or
“–”
EXUQHURU
LQFDVHLWLVSUHVHQW3UHVV2.
7KHERLOHUZLOOVZLWFKWR&+SRZHU
shown on the screen.
The modulation rate can now be
adjusted between minimum 0%
DQGPD[LPXP
-
Press the
“+”
EXWWRQXQWLO\RXUHDFK
-
Press
OK
The selected engine will switch
to max power output, the screen
shows 100% (heating capacity).
&DOLEUDWHWKH)OXH*DV$QDO\VHU
DQGWKHQLQVHUWWKHÀXHJDVSUREH
of the Flue Gas Analyser into the
PHDVXULQJSRLQWRIWKHÀXHJDVSLSH
³´VHHLOOXVWUDWLRQ
-
Wait for one minute and then carry
RXWDFRPEXVWLRQDQDO\VLV
&KHFNZKHWKHUWKH2
2
/CO
2
values
WKDWDUHOLVWHGEHORZFRUUHVSRQGWR
the measured value.
$IWHUWKLVFKHFNKDVEHHQGRQHRQFH
more test the O
2
/CO
2
value at low load
(see Step 2 on page 84).
The O
2
/ CO
2
FKHFNFRQVLVWVRIVWHSVRULIQHFHVVDU\VWHSV
5 sec.
1
Set the load of complete boiler
3UHVVWKHFKLPQH\VZHHSEXWWRQ
IRUVHFRQGV
- Select with
“+”
or
“–”
EXUQHU
The Chimney Power Level is now
Settable (with “+” and “–” buttons)
between the minimum Power and
WKHPD[LPXP3RZHURIWKHFRPSOHWH
boiler.
O
2
/ CO
2
check on full load (Step 1)
Full load
Natural gas (G20)
Propane (G31)*
O
2
Nominal 4,8%
Nominal 5,0%
Minimum 4,1%, maximum 5,6%
Minimum 4,5%, maximum 5,4%
CO
2
Nominal 9,0%
Nominal 10,5%
Minimum 8,6%, maximum 9,4%
Minimum 10,2%, maximum 10,8%
9DOXHVDUHYDOLGZLWKFORVHGFRYHUDLUER[
RQO\SRVVLEOHLI/3*FRQYHUVLRQNLWLVLQVWDOOHG