Routine
Maintenance
3
STERRAD
®
Sterilization System Routine Maintenance Guide
25
1. Press
OPEN DOOR
to change the displayed interval to the next
available option, based on the PM Level 1 duration. The PM Level 2
interval can be only 1, 2 or 3 times the PM Level 1 duration, with a
range of 500 to 4000 cycles. A duration outside the valid range
reverts to the default values.
2. Press
CANCEL
to transfer to the PM Level 1 Months Interval menu.
PM Level 1 Month Interval
The following is displayed:
PM 1 MONTHS = XX
OPEN(chng)-CLOSE(accept)
XX is the current PM Level 1 service interval in months.
1. Press
CLOSE DOOR
to move the cursor to each digit in turn.
Pressing
OPEN DOOR
increments the digit by 1 ranging from 0 to
9. The interval type months can be programmed to a value between
4 and 12 months, with a default value of 6 months.
2. Press
CANCEL
to transfer to the PM Level 2 Months Interval menu.
PM Level 2 Months Interval
The following is displayed:
PM 2 MONTHS = XX
OPEN(chng)-CLOSE(accept)
XX is the default PM level 2 months service interval. The default PM
level 2 months interval is twice that of the PM level 1 months interval.
1. Press
OPEN DOOR
to change the displayed interval to the next
available option, based on the PM level 1 duration. The PM level 2
interval can be only 1, 2, or 3 times the PM level 1 duration, within a
range of 4 to 24 months. A duration outside the valid range reverts to
the default values.
2. Press
CANCEL
to transfer to the Cassette Log Menu.