The programmable operating curve allows the user to freely program the timing behaviour of the
protection stage with current or time points, either with step or two-point interpolated time calculation.
When the modelled curve formula is known, it is advisable to use the curve parameters to achieve
maximum accuracy.
Events and registers
The capacitor bank overload function (abbreviated "COL" in event block names) generates events and
registers from the status changes in START, TRIP and BLOCKED. The user can select which event
messages are stored in the main event buffer: ON, OFF, or both. The function offers two (2)
independent stages; the events are segregated for each stage operation.
The events triggered by the function are recorded with a time stamp and with process data values.
Table. 5.3.2.1 - 52. Event messages.
Event block name
Event names
COL1
Start On
COL1
Start OFF
COL1
Trip ON
COL1
Trip OFF
COL1
Block ON
COL1
Block OFF
COL2
Start ON
COL2
Start OFF
COL2
Trip ON
COL2
Trip OFF
A
AQ
Q-C255
-C255
Instruction manual
Version: 2.06
68
© Arcteq Relays Ltd
IM00035
Содержание AQ-C255
Страница 1: ...AQ C255 Capacitor bank protection IED Instruction manual ...
Страница 2: ......
Страница 363: ...Figure 7 4 180 Example block scheme A AQ Q C255 C255 Instruction manual Version 2 06 Arcteq Relays Ltd IM00035 361 ...
Страница 384: ...Figure 8 14 202 Device installation A AQ Q C255 C255 Instruction manual Version 2 06 382 Arcteq Relays Ltd IM00035 ...