![Arcteq AQ-C255 Скачать руководство пользователя страница 289](http://html1.mh-extra.com/html/arcteq/aq-c255/aq-c255_instruction-manual_2964905289.webp)
Figure. 5.4.3 - 143. Example of timers and pick-up parameters (activated pick-up and instant release due to overcurrent).
In the example above, the cold load pick-up function activates after the measured current dips below
the
I
low
setting and has been there for
T
set
amount of time. When the
I
m
exceeds the
I
high
setting, a
counter starts counting towards the
T
max
time. The measured current exceeds the
I
over
setting during
the start-up situation and causes the cold load pick-up signal to be released immediately.
A
AQ
Q-C255
-C255
Instruction manual
Version: 2.06
© Arcteq Relays Ltd
IM00035
287
Содержание AQ-C255
Страница 1: ...AQ C255 Capacitor bank protection IED Instruction manual ...
Страница 2: ......
Страница 363: ...Figure 7 4 180 Example block scheme A AQ Q C255 C255 Instruction manual Version 2 06 Arcteq Relays Ltd IM00035 361 ...
Страница 384: ...Figure 8 14 202 Device installation A AQ Q C255 C255 Instruction manual Version 2 06 382 Arcteq Relays Ltd IM00035 ...