Event block name
Event names
DFT1
df/dt>/< (3) Block OFF
DFT1
df/dt>/< (4) Block ON
DFT1
df/dt>/< (4) Block OFF
DFT1
df/dt>/< (5) Block ON
DFT1
df/dt>/< (5) Block OFF
DFT1
df/dt>/< (6) Block ON
DFT1
df/dt>/< (6) Block OFF
DFT1
df/dt>/< (7) Block ON
DFT1
df/dt>/< (7) Block OFF
DFT1
df/dt>/< (8) Block ON
DFT1
df/dt>/< (8) Block OFF
The function registers its operation into the last twelve (12) time-stamped registers. The table below
presents the structure of the function's register content.
Table. 5.3.17 - 173. Register content.
Date and time
Event
df/dt>/< Pre-trig
(Hz/s)
f Pre-trig (Hz)
df/dt>/< Fault
(Hz/s)
f Fault
(Hz)
Used SG
dd.mm.yyyy
hh:mm:ss.mss
Event
name
Start/Trip –20ms
df/dt>/<
Start/Trip –20ms
frequency
Fault df/dt>/<
Fault
frequency
Setting groups
1...8 active
5.3.18 Overpower protection (P>; 32O)
The overpower function is used for instant and time-delayed active over-power protection. In
applications like feeder, generator and motor protection this function is used to detect overload
situations by measuring three-phase active power.
Figure. 5.3.18 - 104. Operating characteristics of overpower protection.
The overpower function uses a total of eight (8) separate setting groups which can be selected from
one common source.
A
AQ
Q-C255
-C255
Instruction manual
Version: 2.06
198
© Arcteq Relays Ltd
IM00035
Содержание AQ-C255
Страница 1: ...AQ C255 Capacitor bank protection IED Instruction manual ...
Страница 2: ......
Страница 363: ...Figure 7 4 180 Example block scheme A AQ Q C255 C255 Instruction manual Version 2 06 Arcteq Relays Ltd IM00035 361 ...
Страница 384: ...Figure 8 14 202 Device installation A AQ Q C255 C255 Instruction manual Version 2 06 382 Arcteq Relays Ltd IM00035 ...