Commissioning
43
MAXXfl o EVO 150/302
MAKE ADJUSTMENTS IN 1/8 TURN STAGES AND WAIT ONE MINUTE BETWEEN EACH
ADJUSTMENT
CAUTION
If you are experiencing CO readings that exceed 200 ppm after 20 minutes of burner operation,
please fi rst check that your gas analyser is functioning correctly and then contact Andrews Water
Heaters on the customer support number given on the rear cover of this manual, for advice
.
•
When the adjustments are complete, turn OFF the chimney sweep function and wait until the heat
generator stops before continuing (see Figure below)
•
Remove the gas analyser and replace the rubber bung in the fl ue sample point
•
Replace the throttle screw cover
5.2.3 BOTTOM HEAT ENGINE COMMISSIONING
If the Commissioning Controller (available from Andrews Water Heaters, part code 7729664)
is used, the commissioning procedure for the top heat engine (5.2.2) should be followed, to
commission the bottom heat engine.
Special operations (1/3)
Chimney sweep function
Off
Connection port
The commissioning controller (if available)
The commissioning controller (if available)
is connected to the bottom heat engine
is connected to the bottom heat engine
controller via the connection port located on
controller via the connection port located on
the electrical enclosure just above the spark
the electrical enclosure just above the spark
generator (see illustration)
generator (see illustration)
CO
2
_
+
CO
2
Throttle screw
adjuster
Содержание 7800597
Страница 2: ...General 2 MAXXflo EVO 150 302 Blank Page ...
Страница 19: ...Technical Data 19 MAXXflo EVO 150 302 PCB2 3 6 WIRING DIAGRAM MAXXflo EVO 150 kW MODEL ...
Страница 86: ...Blank page ...
Страница 87: ...Blank page ...
Страница 88: ...April 2022 FM00866 EMS514880 13755 M10419 Rev A April 2022 ...