Commissioning
42
MAXXfl o EVO 150/302
•
Use the control thumb wheel to select “Setup” page and press the thumb wheel to select “Special
operations” (see below)
•
Use the thumb wheel to select the “Chimney sweep” function and use the thumb wheel to activate this
function. Select and activate “Full load” for the burner output (see below)
•
If this is the fi rst time that the heat engine has been operated, allow for several ignition attempts before
ignition is achieved whilst the gas pipework is being purged of air. It may be necessary to press the reset
button to start the ignition attempts again.
•
Once ignition is successful, allow at least three minutes for the heat engine to warm up fully before checking
the combustion.
•
Ensure the Boiler temperature remains below 70
O
C during the commissioning process (see above
illustration), if necessary open water outlets to introduce cold water into the tank keeping the boiler
temperature down.
•
With the heater door open, the CO
2
combustion fi gure for G20 will be as follows:
•
If adjustment is required, remove the dust cover of gas valve throttle adjustment screw and insert a 4mm
allen key or medium fl at blade screw driver to adjust (see illustration on next page).
Regional settings
Special operations
Expert
Special operations (1/3)
Chimney sweep function
On
Burner output
Full load
Boiler temp
36.3
O
C
Models
CO
2
Maximum CO
expected
Throttle screw
depth (mm)
MAXXfl o EVO 150
8.9% (+/- 0.2%)
150
10.8 (+/- 1.0mm)
Содержание 7800597
Страница 2: ...General 2 MAXXflo EVO 150 302 Blank Page ...
Страница 19: ...Technical Data 19 MAXXflo EVO 150 302 PCB2 3 6 WIRING DIAGRAM MAXXflo EVO 150 kW MODEL ...
Страница 86: ...Blank page ...
Страница 87: ...Blank page ...
Страница 88: ...April 2022 FM00866 EMS514880 13755 M10419 Rev A April 2022 ...