Maintenance
55
MAXXfl o EVO 150/302
6.1.1.1 INSPECT AND CLEAN BURNER ASSEMBLY
To view the burner and the inside of the heat exchanger it is recommended that you remove the
front of the heat exchanger complete with the fan, venturi and gas valve.
The following steps need to be completed before the combustion chamber and burner can be inspected:-
• Isolate heater from the electrical supply.
• Open the outer heater cover door by removing the screws on the left hand side and opening the door
of the heater.
• Disconnect the electrical connections to the fan
• Disconnect the venturi from the fan, by removing the two cap head screws. Remember to retain the
cork gasket for re-assembly
• Disconnect the spark and Ionisation leads
• Undo the six burner door nuts
• Pull the whole burner assembly outwards and left away from the gas valve
Disconnect power
supply
Disconnect PWM
control
cco
Disconnect
Disconnect
D
D
Содержание 7800597
Страница 2: ...General 2 MAXXflo EVO 150 302 Blank Page ...
Страница 19: ...Technical Data 19 MAXXflo EVO 150 302 PCB2 3 6 WIRING DIAGRAM MAXXflo EVO 150 kW MODEL ...
Страница 86: ...Blank page ...
Страница 87: ...Blank page ...
Страница 88: ...April 2022 FM00866 EMS514880 13755 M10419 Rev A April 2022 ...