44
Operation Guide – Grain bagger GB-series
Anderson Group
Figure 23 – Rear Plate
5. Make the interior fold of the bag stick out by 12 in (30 cm).
6. Install an elastic (C) on the tunnel, behind the folds of the bag and the rectangular tube
behind the machine, by attaching it on each side of the rear plate (Figure 24 – Elastic). The
elastic allows the bag to stretch out one fold at a time.
Figure 24 – Elastic
7. With other elastics (D), attach the first elastic to the sides and to the top of the tunnel to pre-
vent it from moving (Figure 25 – Attachment elastics).
Содержание GB series
Страница 1: ...Grain bagger GB series 404635 2 Operation Guide 2013...
Страница 2: ......
Страница 3: ...Anderson Group Grain bagger GB series Operation Guide 3...
Страница 4: ......
Страница 8: ......
Страница 14: ...14 Operation Guide Grain bagger GB series Anderson Group Figure 2 Bagger settings...
Страница 34: ......
Страница 58: ......
Страница 76: ...76 Operation Guide Grain bagger GB series Anderson Group Figure 54 Changing the casing of the crushing rollers...