24
Operation Guide – Grain bagger GB-series
Anderson Group
1.3.7 Tunnel
The tunnel (A) serves as support for the bag. It is located at the rear of the machine, above the
plate. The plate (B) helps maintain the bag under the tunnel. Two tunnel/plate pairings can be
installed on the bagger depending on the bag size used (5 ft (1.52 m) or 6.5 ft (2 m)). To know how
to change the tunnel/plate pairing, see section 9.
Figure 10 – Tunnel
Содержание GB series
Страница 1: ...Grain bagger GB series 404635 2 Operation Guide 2013...
Страница 2: ......
Страница 3: ...Anderson Group Grain bagger GB series Operation Guide 3...
Страница 4: ......
Страница 8: ......
Страница 14: ...14 Operation Guide Grain bagger GB series Anderson Group Figure 2 Bagger settings...
Страница 34: ......
Страница 58: ......
Страница 76: ...76 Operation Guide Grain bagger GB series Anderson Group Figure 54 Changing the casing of the crushing rollers...