Grain bagger GB-series – Operation Guide
43
Figure 21 – Installing the Bag
Figure 22 – Installing the Bag – Detail
Once the bag is installed, make sure:
l
The bag is installed on the tunnel so the plastic fold sticks out toward the inside (see Figure 22
– Installing the Bag – Detail).
l
The white side of the bag faces the back of the machine while the black side faces the front. If
this is not the case, remove the bag from the tunnel, turn it 180
o
and place it back while mak-
ing sure the white side is facing the back of the machine.
l
The stretch band is on the side of the bag and placed to ensure an easy measurement of the
stretching of the bag.
l
The bag is evenly distributed around the tunnel so that the distance between the bag and the
tunnel is even on each side. Otherwise, the bag could rip or stretch unevenly, which would pre-
vent the bag from filling properly.
4. Elevate the rear plate so that it is 6 to 8 mm (1/4 to 5/16 in) from the machine chassis to allow
the bag to easily deploy (Figure 23 – Rear Plate).
Содержание GB series
Страница 1: ...Grain bagger GB series 404635 2 Operation Guide 2013...
Страница 2: ......
Страница 3: ...Anderson Group Grain bagger GB series Operation Guide 3...
Страница 4: ......
Страница 8: ......
Страница 14: ...14 Operation Guide Grain bagger GB series Anderson Group Figure 2 Bagger settings...
Страница 34: ......
Страница 58: ......
Страница 76: ...76 Operation Guide Grain bagger GB series Anderson Group Figure 54 Changing the casing of the crushing rollers...