36
Operation Guide – Grain bagger GB-series
Anderson Group
Figure 15 – Auger in transportation position
The bagger is designed to travel at a maximum speed of
25 km/h
on paved roads. On uneven soil,
a speed beyond this limit could provoke back-kicks that might damage the bagger or the tractor.
Always adapt your speed to the terrain conditions. Anderson Group declines any responsibility for
damages caused by an excessive or inappropriate speed.
3.2 Terrain choice
Before beginning bagging, prepare the terrain where the grains will be stored. The soil must be firm
and flat, well drained and without scrub growth or other foreign bodies. There must be nothing on
the soil which could damage the plastic bag. Slanted or muddy soils must also be avoided.
3.3 Hitching to the Tractor
Be very careful while conducting machine
hitching and unhitching operations.
Before proceeding, securely immobilize the
machine with the devices provided for this
purpose.
Содержание GB series
Страница 1: ...Grain bagger GB series 404635 2 Operation Guide 2013...
Страница 2: ......
Страница 3: ...Anderson Group Grain bagger GB series Operation Guide 3...
Страница 4: ......
Страница 8: ......
Страница 14: ...14 Operation Guide Grain bagger GB series Anderson Group Figure 2 Bagger settings...
Страница 34: ......
Страница 58: ......
Страница 76: ...76 Operation Guide Grain bagger GB series Anderson Group Figure 54 Changing the casing of the crushing rollers...