Personnel and Equipment Safety Information
This section describes important safety information to avoid personal injury and damage to the equipment
while installing, operating, maintaining, or servicing the equipment. All safety regulations, standards, and
procedures at the analyzer location must be followed.
All personnel involved with the installation, start-up, operation, maintenance, service, or troubleshooting
of the IPS-4 Analyzer must review and follow these Warnings and Cautions.
Warnings
Review and follow these Warnings to avoid personal injury or environmental contamination.
Always disconnect main AC power and/or external power sources to the analyzer before
opening any covers or doors on the analyzer to check or perform maintenance on any compo-
nents within the enclosures.
If it is necessary to open the analyzer’s covers or doors while the circuits are live, test the
area for flammable gases (and proceed only when the area is safe).
Purged Analyzer (Hazardous Location) Applications
To work on the analyzer with it powered up and its Electronics Enclosure door open, the
Purge Bypass Switch must be in the “
BYPASS
” position.
When the Electronics Enclosure door is open, take appropriate precautions to avoid electrical
shock. Hazardous voltages are present inside.
All electrical connections, adjustments, or servicing of the analyzer should be performed only
by properly trained and qualified personnel.
All electrical connections, materials, and methods (plus all safety policies and procedures)
must be made in compliance with local wiring regulations and electrical code for the hazard-
ous area.
Follow appropriate regulatory and/or company procedures to lock out the analyzer while
working on the analyzer electronics.
Before working on the sample system, confirm that the system has been purged with Zero fluid
and is isolated (blocked in) from the process.
!
WARNING
!
WARNING
!
WARNING
!
WARNING
x | IPS-4 Dual Bench (UV / IR) Analyzer
Содержание Western Research IPS-4
Страница 48: ...2 18 IPS 4 Dual Bench UV IR Analyzer This page intentionally left blank...
Страница 140: ...4 48 IPS 4 Dual Bench UV IR Analyzer This page intentionally left blank...
Страница 172: ...5 32 IPS 4 Dual Bench UV IR Analyzer This page intentionally left blank...
Страница 178: ...6 6 IPS 4 Dual Bench UV IR Analyzer This page intentionally left blank...
Страница 218: ...A 2 IPS 4 Dual Bench UV IR Analyzer Analyzer Light Path UV Optical Bench Schematic...
Страница 219: ...Appendix A Drawings A 3 Analyzer Light Path NDIR Optical Bench Schematic CONDENSING...
Страница 222: ...A 6 IPS 4 Dual Bench UV IR Analyzer Detector Board 100 2046...
Страница 223: ...Appendix A Drawings A 7 Display Interface Board 100 2049...
Страница 225: ...Appendix A Drawings A 9 AC Disconnection Board 100 2077...
Страница 227: ...Appendix A Drawings A 11 Relay Board 100 2050...
Страница 228: ...A 12 IPS 4 Dual Bench UV IR Analyzer Analog Board 100 2047...
Страница 229: ...Appendix A Drawings A 13 MCU Board 100 2045...
Страница 230: ...A 14 IPS 4 Dual Bench UV IR Analyzer Xenon Lamp Power Supply Board 100 2061 UV Optical Bench...
Страница 231: ...Appendix A Drawings A 15 Infrared Source Assembly Interface Board 100 2838 IR Optical Bench...
Страница 232: ...A 16 IPS 4 Dual Bench UV IR Analyzer Electronics Enclosure Wiring Diagram Sheet 1 of 5...
Страница 233: ...Appendix A Drawings A 17 Electronics Enclosure Wiring Diagram Sheet 2 of 5...
Страница 234: ...A 18 IPS 4 Dual Bench UV IR Analyzer Electronics Enclosure Wiring Diagram Sheet 3 of 5...
Страница 235: ...Appendix A Drawings A 19 Disconnect Enclosure Wiring Diagram Sheet 4 of 5...
Страница 236: ...A 20 IPS 4 Dual Bench UV IR Analyzer Disconnect Enclosure Wiring Diagram Sheet 5 of 5...
Страница 238: ...S 2 IPS 4 Dual Bench UV IR Analyzer This page intentionally left blank...