Before operating the analyzer for the first time, following a power-up or
reset, or after maintenance, manually backflush the analyzer sample sys-
tem and adjust the sample flow rate. Following initial power-up, a series
of system checks should be performed to ensure the analyzer is operat-
ing properly, prior to commissioning the analyzer into service. If start-up
problems occur refer to page 3-24 in this chapter, to power up the analyzer
and verify it is operating properly.
Hazardous Locations Applications:
For verification and troubleshooting purposes during power up, it
will be necessary to work with the analyzer doors open.
Before powering up the analyzer, test the area for flammable gases.
If a flammable gas atmosphere is present, do not apply power to the
analyzer or any alternate power sources that supply power to the
analyzer components. Proceed only when the area is found to be safe.
DO NOT LEAVE POWER CONNECTED TO THE ANALYZER IF
THE DOORS ARE OPEN UNLESS YOU ARE CONTINUOUSLY
SAMPLING THE AREA FOR FLAMMABLE GASES AND
ATTENDING TO THE ANALYZER.
When the analyzer doors are open, take appropriate precautions to
avoid electrical shock. Hazardous voltages are present inside.
For normal operation, the disconnect cover must be installed, the
analyzer doors must be closed and latched, and the purge system must
be operating normally (bypass key on the “
ACTIVE
” position and the
purge controller indicators GREEN (left) and BLACK (right).
Do not apply main AC power to the analyzer if the Xenon Flash Lamp
Assembly electrical connections have not been made.
!
WARNING
!
CAUTION
Содержание Western Research IPS-4
Страница 48: ...2 18 IPS 4 Dual Bench UV IR Analyzer This page intentionally left blank...
Страница 140: ...4 48 IPS 4 Dual Bench UV IR Analyzer This page intentionally left blank...
Страница 172: ...5 32 IPS 4 Dual Bench UV IR Analyzer This page intentionally left blank...
Страница 178: ...6 6 IPS 4 Dual Bench UV IR Analyzer This page intentionally left blank...
Страница 218: ...A 2 IPS 4 Dual Bench UV IR Analyzer Analyzer Light Path UV Optical Bench Schematic...
Страница 219: ...Appendix A Drawings A 3 Analyzer Light Path NDIR Optical Bench Schematic CONDENSING...
Страница 222: ...A 6 IPS 4 Dual Bench UV IR Analyzer Detector Board 100 2046...
Страница 223: ...Appendix A Drawings A 7 Display Interface Board 100 2049...
Страница 225: ...Appendix A Drawings A 9 AC Disconnection Board 100 2077...
Страница 227: ...Appendix A Drawings A 11 Relay Board 100 2050...
Страница 228: ...A 12 IPS 4 Dual Bench UV IR Analyzer Analog Board 100 2047...
Страница 229: ...Appendix A Drawings A 13 MCU Board 100 2045...
Страница 230: ...A 14 IPS 4 Dual Bench UV IR Analyzer Xenon Lamp Power Supply Board 100 2061 UV Optical Bench...
Страница 231: ...Appendix A Drawings A 15 Infrared Source Assembly Interface Board 100 2838 IR Optical Bench...
Страница 232: ...A 16 IPS 4 Dual Bench UV IR Analyzer Electronics Enclosure Wiring Diagram Sheet 1 of 5...
Страница 233: ...Appendix A Drawings A 17 Electronics Enclosure Wiring Diagram Sheet 2 of 5...
Страница 234: ...A 18 IPS 4 Dual Bench UV IR Analyzer Electronics Enclosure Wiring Diagram Sheet 3 of 5...
Страница 235: ...Appendix A Drawings A 19 Disconnect Enclosure Wiring Diagram Sheet 4 of 5...
Страница 236: ...A 20 IPS 4 Dual Bench UV IR Analyzer Disconnect Enclosure Wiring Diagram Sheet 5 of 5...
Страница 238: ...S 2 IPS 4 Dual Bench UV IR Analyzer This page intentionally left blank...