
SG Series Programming
Calibration
M550129-03 Rev L
7-7
7.6
CURRENT PROGRAMMING CALIBRATION
(ETHERNET)
Preparation:
1. Power down the Unit Under Test (UUT) and remove the input power for
safety.
2. Allow 5 minutes for the energy in the output to bleed down to a safe level.
3.
Attach the precision shunt between the power supply’s output terminals.
4. Attach the voltmeter across the shunt.
5. Apply input power and power up the UUT.
6. After the UUT has initialized, begin the calibration procedure.
STEP
DESCRIPTION
1.
Issue a *CLS command.
2.
Issue a *RST command.
3.
Program the overvoltage protection to maximum to prevent nuisance trips:
CAL:OUTP:VOLT:PROT:DAC 65535
4.
Program the output voltage to full scale to prevent Constant-Voltage
operation:
CAL:OUTP:VOLT:DAC 65535
5.
Program the output of the first calibration point by sending the following
command string from the computer:
CAL:OUTP:CURR:DAC 3275
6.
Let the output settle and measure the output current with the current shunt
and the high precision voltmeter; this is value 1.
7.
Enter the actual output current of the first calibration point:
CAL:OUTP:CURR:FIVEPOINT 1 <value 1>
8.
Program the output of the second calibration point by sending the following
command string from the computer:
CAL:OUTP:CURR:DAC 19000
9.
Let the output settle and measure the output current with the current shunt
and the high precision voltmeter; this is value 2.
Содержание Sorensen SG Series
Страница 2: ......
Страница 4: ...Contents SG Series Programming viii M550129 03 Rev L This page intentionally left blank...
Страница 6: ...Contents SG Series Programming x M550129 03 Rev L This page intentionally left blank...
Страница 8: ...Contents SG Series Programming xii M550129 03 Rev L This page intentionally left blank...
Страница 14: ...Contents SG Series Programming xviii M550129 03 Rev L This page intentionally left blank...
Страница 16: ...Overview SG Series Programming 1 2 M550129 03 Rev L This page intentionally left blank...
Страница 126: ...SCPI Command Operation SG Series Programming 6 60 M550129 03 Rev L This page intentionally left blank...
Страница 143: ...M550129 03 Rev L 8 1 SECTION 8 SCPI STATUS IMPLEMENTATION...
Страница 144: ...SCPI Status Implementation SG Series Programming 8 2 M550129 03 Rev L This page intentionally left blank...
Страница 146: ...This page intentionally left blank...