
III-4
2. INSTALLATION PROCEDURES
2-1. Location
Select a place where an ample space can be secured for the machine
by paying full attention to the required floor area and the following items:
•
There must be no pillars and other obstacles where the tools are
installed and removed. (At least 835 mm {33 in.} long tools must be
able to be horizontally installed and removed through the left and right
frame gaps of the machine.)
•
The ceiling must be at least 1000 mm {40 in.} from the top of the
machine. (Take the height of the base plates into account.)
•
There must be an additional space to locate a tool storage case and
any other necessary items.
•
Space must be available for worksheet loading, part unloading,
machine maintenance, and other tasks.
A space of 1000 mm {40 in.} or more must be available at the rear of
the machine.
An enough space must be available for the cover of the electrical
enclosure to be opened.
A space of 1000 mm {40 in.} or more must be available from the cover
edge at the right side of the ram.
NOTICE
O
Do not install the machine in a place where it is exposed to dust from such
operations as sandblasting and to direct sunlight, rain and wind.
O
It is ideal to install the machine on a concrete floor to prevent deflection due to
ground subsidence.
1000 mm
{40 in.}
700 mm
{28 in.}
300 mm
{12 in.}
1000 mm
{40 in.}
FRONT
Содержание RG35S-100
Страница 1: ...RG25 125 E02 200510 PRESS BRAKE ZII RG35S 100 OPERATOR S MANUAL...
Страница 6: ...vi...
Страница 7: ...I 1 Part I Safety 1 Safety rules I 2 2 DANGER and WARNING plates I 10...
Страница 16: ...I 10 2 DANGER AND WARNING PLATES Keep the DANGER and WARNING plates well noticeable and never remove them...
Страница 18: ...I 12...
Страница 22: ...II 4...
Страница 89: ...V 45 4 Turn the machine circuit breaker to OFF The POWER lamp extinguishes 5 Turn off the shop circuit breaker...
Страница 100: ...VI 8 4 HYDRAULIC CIRCUIT DIAGRAMS 4 1 RG35S...
Страница 102: ...VI 10 4 2 RG50 RG80 and RG100...
Страница 104: ...VI 12...
Страница 106: ...VI 14...
Страница 109: ......
Страница 110: ...AMADA COMPANY LTD 200 Ishida Isehara Kanagawa JAPAN Printed on recycled paper...