CHAPTER 4: OPERATING INSTRUCTIONS
IS-300CA INVERTER POWER SUPPLY
990-418
4-3
3.
If no error is detected in Step 2, ensure that the three
READY
requirements are met:
•
The Power Supply
WELD ON/OFF LED
must be ON.
•
The
ON/OFF
setting on the Pendant must be set to ON.
•
An external
WELD ON/OFF
signal must be present at the I/O terminal block.
4.
Check that the Power Supply green
READY
lamp is on.
5.
Start the weld sequence and confirm that the welding current is flowing normally by checking
the red
WELD
lamp and the Monitor screen.
6.
Make any necessary adjustments to the schedule so that the work piece will be properly welded.
7.
When welding multiple work pieces according to multiple schedules, change the
SCHEDULE #
and set new time and welding currents.
8.
Set the upper and lower limits on the Pendant
MONITOR SET
screen for each
SCHEDULE
#
.
9.
Begin welding following normal procedures. Adjust the
SCHEDULE
settings as necessary.
Содержание IS-300CA
Страница 1: ...990 418 REV D INVERTER POWER SUPPLY IS 300CA OPERATION MANUAL...
Страница 26: ......
Страница 30: ......
Страница 92: ......
Страница 104: ...APPENDIX A TECHNICAL SPECIFICATIONS IS 300CA INVERTER POWER SUPPLY A 4 990 418 Duty Cycles...
Страница 162: ...APPENDIX E EtherNet IPTM COMMUNICATIONS IS 300CR INVERTER POWER SUPPLY E 2 990 418 System Hardware Overview...
Страница 208: ...AMADA WELD TECH INC 1820 South Myrtle Ave Monrovia CA 91016 U S A TEL 1 626 303 5676 FAX 1 626 358 8048...