
CHAPTER 3: USING PROGRAMMING FUNCTIONS
IS-300CA INVERTER POWER SUPPLY
990-418
3-41
WELD STOP OFF T IME
Set va lue
We ld ing stop
s igna l input
t
Monitor measurement
Weld Time WELD1, WELD2, WELD3
t = MONITOR FIRST TIME
~
~
f. MONITOR SLOPE MODE
Select whether or not to include a slope period in the monitored value to be displayed.
EXCLUDE
Slope period will not be included.
INCLUDE
Slope period will be included.
g. WELD STOP OFF TIME
Sets the neglecting time of the welding stop signal for each of
WELD1
,
WELD2
and
WELD3
.
Even if the welding stop signal is input during welding, the current is supplied for the set time
and the sequence will switch to the next.
When the welding stop signal is input within WELD STOP OFF TIME
The welding is stopped at the end of WELD STOP OFF TIME.
Содержание IS-300CA
Страница 1: ...990 418 REV D INVERTER POWER SUPPLY IS 300CA OPERATION MANUAL...
Страница 26: ......
Страница 30: ......
Страница 92: ......
Страница 104: ...APPENDIX A TECHNICAL SPECIFICATIONS IS 300CA INVERTER POWER SUPPLY A 4 990 418 Duty Cycles...
Страница 162: ...APPENDIX E EtherNet IPTM COMMUNICATIONS IS 300CR INVERTER POWER SUPPLY E 2 990 418 System Hardware Overview...
Страница 208: ...AMADA WELD TECH INC 1820 South Myrtle Ave Monrovia CA 91016 U S A TEL 1 626 303 5676 FAX 1 626 358 8048...