............................................................................................................................................................................................................................................................
Pre-installation checklist
Installation Checklists
E - 2
8AL90212USAC ed01
November 20, 2008
............................................................................................................................................................................................................................................................
Pre-installation checklist
Table E-1
Pre-Installation Checklist
Pre-Installation Checklist
Rack Space (If rack server)
2u
Power
Receptacle(s) available
UPS available
LAN
Min. 100 Mbit switch port available
Network Address Translation
Is NAT in use?
Is NAT device SIP-enabled
TCP/IP Settings Page
IP address for server
Netmask for server
Default gateway
Web Server name
Host name
Domain name
Primary NTP server
Secondary NTP server
Primary Nameserver
Secondary Nameserver
Содержание OmniTouch ACS 7.1.4
Страница 6: ...Contents v i 8AL90212USAC ed01 November 20 2008...
Страница 18: ...To connect the server to the network Facility Planning 2 6 8AL90212USAC ed01 November 20 2008...
Страница 22: ...To verify your Ethernet port configuration Planning Your LAN 3 4 8AL90212USAC ed01 November 20 2008...
Страница 36: ...To prepare your network Planning Your OmniTouch ACS Stack 6 4 8AL90212USAC ed01 November 20 2008...
Страница 40: ...Application desktop sharing and editing Planning for Data Conferencing 7 4 8AL90212USAC ed01 November 20 2008...
Страница 118: ...Media servers Stack Design and Operation A 6 8AL90212USAC ed01 November 20 2008...
Страница 136: ...To remove an ActiveX object Supported Browsers and Recommended Settings D 6 8AL90212USAC ed01 November 20 2008...
Страница 146: ...Acceptance checklist Installation Checklists E 10 8AL90212USAC ed01 November 20 2008...