Initial commissioning of device
Product manual 2CKA00xx73xxxxx
│
42
The initial commissioning of the ABB SmartTouch
®
is described in general in the following. The
specific initial commissioning is available in the system-specific description on commissioning.
1. Select the desired system.
– Observe for the special features during commissioning with free@home.
Notice
If there is more than one System Access Point in a free@home system, the
System Access Point to which a connection is to be established must be
selected manually.
2. Specify the country in which the device is operated.
Notice
The setting is important, since there are countries with local restrictions for
wireless networks.
3. Tap on "Next".
4. Activate WiFi and establish a connection to a network
– For a manual connection, then enter the network information.
5. Tap on "Next".
6. Specify the time zone and time setting.
7. Tap on "Next".
– The device connects itself with the system. A load screen follows.
Notice
The following parameter setting of the functions is made via the DCA
commissioning tool, or alternatively, via the Web-based user interface of
free@home.
Special features
Depending on the selected system, please observe the following special features:
■
ABB-Welcome IP:
– The configuration is taken over fully automatic.
– Access to MyBuildings must be activated
■
ABB-Welcome
®
:
– only 1 operating page in the panel is possible
■
ABB-Welcome
®
+ ABB-Welcome IP:
– ABB-Welcome
®
must be configured first, then follows the configuration of ABB-Welcome
IP
■
ABB-free@home
®
–
Synchronisation of the weather data is possible only via MyBuildings