Materials:
One 2 inch pipe with flange
One 2 inch pipe coupling
or
One 2 inch mounting pipe (installed). Length is dependent upon final desired analyzer height.
To install a mounting pipe:
1.
Select a location to install the mounting pipe that allows easy access and is close to the sample
probe. Lines should be as short as possible.
2.
Install a mounting pipe, and ensure the pipe is vertically aligned.
3.
Screw 2 inch pipe coupling onto the top of the mounting pipe.
4.
Screw optional mounting flange pipe into the top of the pipe coupling.
5.
Proceed to mount the analyzer (see section
4.3.2
Pipe saddle installation for pipe saddle mounting
If installing an analyzer using the pipe saddle mounting kit, use this procedure to install the pipe
saddle. Before beginning, review the procedure and the materials required for installation. The
optional pipe with flange may be used in installations requiring additional stability.
Materials:
One pipe saddle
One 2 inch mounting pipe. Length is dependent upon final desired analyzer height.
One 2 inch pipe with flange kit. (Optional kit comes with flange, screws, washers, and
coupling.)
To install the pipe saddle:
1.
Position the pipe saddle on the meter run. Select a location that allows easy access and is close
to the sample probe. Lines should be as short as possible.
2.
Temporarily attach the saddle on the meter run pipe using the U-bolt and associated hardware
(see
3.
Screw one end of the 2 inch pipe into the saddle flange on the pipe saddle until wrench-tight.
Place a level against the pipe and vertically align, adjusting the saddle until vertical alignment
is achieved.
4.
After vertical alignment, securely tighten saddle mounting bolts.
5.
If the configuration includes the optional pipe with flange, screw the 2 inch pipe coupling onto
the top of the mounting pipe using supplied hardware.
6.
Screw the optional mounting pipe with flange into the top of the pipe coupling.
7.
Proceed to mount the analyzer (see section
Figure 4-3: Typical pipe saddle installation
4.3.3
Shelf installation
If the installation calls for the analyzer shelf mounting kit, use this procedure to mount the shelf.
Before beginning, review the procedure and the materials required for installation.
Materials:
Four ¼ inch x 20, 1-inch SST hex head machine screws
Mounting shelf with flange