![ABB LD 800HSE Скачать руководство пользователя страница 32](http://html.mh-extra.com/html/abb/ld-800hse/ld-800hse_manual_2735032.webp)
Display Elements
Section 2 Hardware Installation
32
3BDD011677-600 A
Display Elements
On the front of the linking device there are four LEDs (P - Power Supply, HSE -
Ethernet Port, F - Error Status, R - Ready) indicating the device status and another
four LEDs (1, 2, 3, 4) indicating the statuses of the four H1 links.
shows the symbols used in this document for the various indications of the
display elements (LED block).
Table 4. Indication of Display Elements
Symbol
Indication of Display Element
Off
red
Permanent red
yellow
Permanent yellow
green
Permanent green
red
Flashing red
yellow
Flashing yellow
green
Flashing green
green
Flashing green, slow (0.5 Hz)
green
Flashing green, fast (5 Hz)
Содержание LD 800HSE
Страница 2: ......
Страница 3: ...Device Management FOUNDATION Fieldbus Linking Device LD 800HSE and LD 800HSE EX V3 6 0 0 ...
Страница 78: ...Built in Web Server Section 4 Linking Device Diagnostics 78 3BDD011677 600 A Figure 24 LD 800HSE Contact Page ...
Страница 94: ...Linking Device Web Server Diagnostics Section 4 Linking Device Diagnostics 94 3BDD011677 600 A ...
Страница 102: ...Device Redundancy Appendix B Limits and Performance Data 102 3BDD011677 600 A ...
Страница 124: ...Redundancy Behavior Appendix C Technical Reference 124 3BDD011677 600 A ...
Страница 135: ......