6/1531-ANF 901 14 Uen F1 2013-11-29
To see the cable connections for base station see chapter “Pinning” in
“Installation Guide Base Station”.
5.4
Base station cable length
Care should be taken not to exceed the allowed length of the base
station cable. For details see table 2 Maximum cable length, when
powering via data pairs and express powering pairs. For BS3x0 and
BS3x2 latest version. on page 24
In case of installation in places where already installed cables are
reused make sure that the quality of the present network comply with the
requirements, see chapter 6.2 Dimensioning on page 46.
It is also possible to measure the voltage at the base station. This should
be done when 8 calls are active at the same base station. The voltage
should comply with the requirements, see chapter 9.3.1 Base stations on
page 57.
Table 2 Maximum cable length, when powering via data pairs and
express powering pairs. For
BS3x0 and BS3x2 latest version.
Table 3 Maximum cable length, when powering via data pairs and
express powering pairs. For BS330 and BS340 prior R4H.
All figures are in meters, and based at 42 V DC
The individual signaling twisted cable pairs and the EPP pair follow an
earlier recommendation, see table 9 Twisted pair cable data on page 51
Cable
diameter
(mm)
Base station with
0 EPP
1 EPP
0.4
1 600
1 700
0.5
1 700
1 700
0.6
1 700
1 700
Cable
diameter
(mm)
Base station with
0 EPP
1 EPP
2 EPP
0.4
645
965
1 290
0.5
965
1 450
1 600
0.6
1 585
1 700
1 700