
6
ELECTRIC SHOCK
Electric
shock
hazard.
Before
servicing, shut off all electrical power
to
the
unit,
including
remote
disconnects, to avoid shock hazard
or injury from rotating parts. Follow
proper Lockout-Tagout procedures.
WARNING
Safety
Attention should be paid to the following statements:
NOTE
- Notes are intended to clarify the unit installation, operation and maintenance.
CAUTION
- Caution statements are given to prevent actions that may result in
equipment damage, property damage, or personal injury.
WARNING
- Warning statements are given to prevent actions that could result in
equipment damage, property damage, personal injury or death.
DANGER
- Danger statements are given to prevent actions that will result in equipment
damage, property damage, severe personal injury or death.
ELECTRIC
SHOCK,
FIRE
OR
EXPLOSION HAZARD
Failure to follow safety warnings
exactly could result in dangerous
operation, serious injury, death or
property damage.
Improper servicing could result in
dangerous operation, serious injury,
death, or property damage.
When servicing controls, label all
wires
prior
to
disconnecting.
Reconnect wires correctly.
Verify proper operation after
servicing. Secure all doors with
key-lock or nut and bolt.
WARNING
QUALIFIED INSTALLER
Improper
installation,
adjustment,
alteration, service or maintenance
can
cause
property
damage,
personal injury or loss of life. Startup
and service must be performed by a
Factory Trained Service Technician.
A copy of this IOM should be kept
with the unit.
WARNING
Содержание CB-024
Страница 40: ...40 Refrigerant Piping Diagrams Figure 12 A C only piping AHU above CU ...
Страница 41: ...41 Figure 13 A C only piping AHU below CU ...
Страница 42: ...42 Figure 14 Modulating hot gas reheat piping AHU above CU ...
Страница 43: ...43 Figure 15 Modulating hot gas reheat piping AHU below CU ...
Страница 44: ...44 Figure 16 Hot gas bypass piping AHU above CU ...
Страница 45: ...45 Figure 17 Hot gas bypass piping AHU below CU ...
Страница 46: ...46 Figure 18 Modulating hot gas reheat with hot gas bypass piping AHU above CU ...
Страница 47: ...47 Figure 19 Modulating hot gas reheat with hot gas bypass piping AHU below CU ...
Страница 48: ...48 Figure 20 Heat pump piping AHU above CU ...
Страница 49: ...49 Figure 21 Heat pump piping AHU below CU ...
Страница 50: ...50 Figure 22 Heat pump with modulating hot gas reheat piping AHU above CU ...
Страница 51: ...51 Figure 23 Heat pump with modulating hot gas reheat AHU below CU ...