ZXCBTS (V5.4) CDMA Micro Base Transceiver Station & Remote Station Installation Manual
1-6
Engineering Survey
Report
Yes
No
Start
BTS Engineering
Design and
Construction Drawing
Environment
Acceptance Report
Cabling rack Power
supply system
Grounding system
Other accessories
Preparation for
engineering
installation
Check construction
conditions
Open-box inspection
Packing list
Goods are
correct
Goods Error Feedback
List
Goods Replacement
Feedback List
Install the shelf
Install the power
supply system
Install the
grounding system
Check cable connections
in the shelf
Connect trunk cables
Check the primary
antenna feeder system
Install the GPS
Set DIP switches
Hardware installation
check
End
Fig. 1.3-1 Hardware Installation Flow Diagram