-i-
Contents
1 Overview .................................................................................................................................................. 1-1
1.1 Introduction to Micro-BTS ............................................................................................................1-1
1.2 Installation Overview.....................................................................................................................1-4
1.3 Installation Flow ............................................................................................................................1-5
1.4 Points for Attention ........................................................................................................................1-7
2 Preparations ............................................................................................................................................ 2-1
2.1 Installation Environment Check.....................................................................................................2-1
2.1.1 Checking Equipment Building Conditions..........................................................................2-1
2.1.2 Checking Indoor Environment ............................................................................................2-1
2.1.3 Checking Power Supply System .........................................................................................2-2
2.1.4 Checking Grounding System ..............................................................................................2-2
2.1.5 Checking Relative Devices .................................................................................................2-2
2.2 Tools and Instruments ....................................................................................................................2-2
2.3 Technical Documents .....................................................................................................................2-3
3 Open-box Inspection ............................................................................................................................... 3-1
3.1 Checking Packing List and Goods .................................................................................................3-1
3.2 Packaging.......................................................................................................................................3-2
3.3 Open-box Procedures.....................................................................................................................3-2
4 Installation of Cabinet ............................................................................................................................ 4-1
4.1 Installation Flow ............................................................................................................................4-1
4.2 Installation Modes..........................................................................................................................4-2
4.2.1 Installing Cabinet on Pole ...................................................................................................4-2
4.2.2 Installing Cabinet on Wall...................................................................................................4-6