ZXCBTS (V5.4) CDMA Micro Base Transceiver Station & Remote Station Installation Manual
12-2
12.2 Checking External Cables before Power-on
1. Use the multimeter to measure if the 120V AC power meets the requirement.
2. Check if the connector of the 120V AC power cable is connected firmly.
3. Check if T1 cable connectors are connected tight.
4. Check if the optical fibers are connected correctly.
5. Use the tester to check if the standing wave ratio of the antenna feeder system is
lower than 1.5. It should be lower than 1.3 generally. Check if feeder cable
connectors are assembled correctly, and if the feeder cables and antennae are in
good condition.
6. Check if correct labels are stuck on the cables firmly.
12.3 Powering on/off the Cabinet
No power switch is configured in micro-BTS or remote stations, so you need to power
on/off them by plugging/unplugging the power connector or powering on/off the power
supply equipment.
After power-on, debug the BTS through the BSC.