ZXCBTS (V5.4) CDMA Micro Base Transceiver Station & Remote Station Installation Manual
2-4
Engineering Survey Report
should be filled by the technical engineers of the
equipment provider during site survey. If they can not carry out the survey in
time, you should survey the site, fill in the report and then send it to the
equipment provider. This report is used for the preparation of construction
materials.
BTS Engineering Design and Construction Drawing
should be prepared by the
design unit you entrusted, and a copy should be provided to the equipment
provider before the delivery.
Environment Acceptance Report
is used by the technical engineers of the
equipment provider to check the construction environment during site survey. If
any inconformity is found, you are required to solve the problem. Before the
construction, the second check will be implemented.
2.
ZXCBTS(V5.4)CDMA Micro Base Transceiver Stations/RF Remote Stations
Installation Manual, ZXCBTS(V5.4)CDMA Micro Base Transceiver Stations/RF
Remote Stations Technical Manual, ZXCBTS(V5.4)CDMA Micro Base
Transceiver Stations/RF Remote Stations Hardware Manual,
ZXCBTS(V5.4)CDMA Micro Base Transceiver Stations/RF Remote Stations
Maintenance Manual
3. Installation Acceptance Report, Test Acceptance Report
Installation Acceptance Report
and
Test Acceptance Report
should be offered to
you by the equipment provider during delivery.
Installation Acceptance Report
is filled after the BTS installation completes.
Test Acceptance Report
is filled
during the BTS commissioning.