Chapter
4
Installation
of Cabinet
4-7
Fig. 4.2-6 Schematic Diagram of Installing the Cabinet onto the Wall
Note
The modules and cables in micro-BTS (including ultra-wide coverage
micro-BTS) and remote stations have been installed, connected and tested
before delivery. Before commissioning, you only need to check if they are loose
due to conveyance. Refer to Chapter 7 for the connection of cables between
cabinets.
According to the configuration requirement, you might need to add optical
fiber modules or CSM5000 expansion modules in the expansion slots of the
corresponding BDM board.
If any fault occurs, the maintenance personnel can refer to this manual for
simple maintenance.