Chapter
1
Overview
1-5
Install the GPS
Install the shelf
Check internal
cables
Set the DIP
switches
Install the ZXCBTS cabinet
Connect trunk
cables
Install the power
supply system
Install the
grounding system
Install the
sunshade cover
Install the
antenna system
Fig. 1.2-1 Schematic Diagram of the Hardware Installation of Micro-BTS/Remote Station
1.3 Installation Flow
Install the equipment following the specified procedures strictly:
1. Install the support;
2. Locate the cabinet on the support;
3. Secure the cabinet;
4. Install the sunshade cover (necessary for outdoor installation);
5. Connect power cables and grounding cables of the cabinet;
6. Connect T1 cables of the cabinet;
7. Install the primary antenna feeder system to connect with the RF cables;
8. Install the GPS;
9. Install and test the boards and modules, and set the DIP switches;
10. Check the installation.
See Fig. 1.3-1.