25-16
Chargers
Charging System
25
18. Remove T40 bolt securing horn. Torque 8 lb-ft
(11 Nm).
19. Disconnect wires (x2) from horn.
20. Remove horn.
21. Disconnect charge outlet connector.
22. Remove T30 bolts (x2) securing HCU bracket.
Torque 6 lb-ft (8 Nm).
23. Remove T30 bolts (x2) securing HCU bracket.
Torque 6 lb-ft (8 Nm).
24. Loosen T30 bolts (x2) securing charger
connector brackets. Torque 6 lb-ft (8 Nm).
25. Remove T25 bolt from each side of the
charger mount. Torque 6 lb-ft (8 Nm).
26. Remove T30 bolts (x4) securing the charger
support bracket to frame. Torque 8 lb-ft
(11 Nm).
Summary of Contents for SR/S
Page 2: ......
Page 10: ...2 4 General Information ...
Page 68: ......
Page 90: ......
Page 178: ......
Page 210: ......
Page 289: ...Electrical Main Bike Board MBB 70 41 70 ...
Page 290: ......