25-10
Chargers
Charging System
25
21. Position the released high voltage harness
aside to gain access to storage liner support
bolts on left side.
22. Remove left rear bolt securing storage liner
support to frame. Tool: T30. Torque: 7.8 lb-ft
(11 Nm).
23. Position harnesses aside and remove bolts
(x2) securing right side of storage liner
support bolts to frame. Tool: T30. Torque:
7.8 lb-ft (11 Nm).
24. Due to the brake hose routing (on left side),
right side of tank liner support/rear charger
assembly has to come out first.
25. Slightly rotate the tank liner support/rear
charger assembly clockwise to reduce
interference between the mounting tabs and
the motorcycle frame.
26. Once the assembly is unobstructed, tilt the
front upward to gain access to the charger
harness connectors.
Summary of Contents for SR/S
Page 2: ......
Page 10: ...2 4 General Information ...
Page 68: ......
Page 90: ......
Page 178: ......
Page 210: ......
Page 289: ...Electrical Main Bike Board MBB 70 41 70 ...
Page 290: ......