Motor and Drive System
Controller
30-39
30
Motor Controller Carrier [Before 2022MY]
CAUTION:
Always perform the High Voltage
Discharging procedure prior to servicing any
High Voltage component or connection. Proper
procedures must be followed! To protect
electrical components, perform the following
tasks in the order given. Do not deviate from the
repair procedure processes.
NOTICE:
Before carrying out any work on the
electrical system, remove the key from the key
switch.
Tools Required (includes tools required for
parent jobs):
•
T25
•
T30
•
3/16” standard screwdriver
•
2mm hex wrench
•
3mm hex wrench
•
10mm combination wrench
•
10mm socket and ratchet
•
Non-marring trim removal/pry tool
•
Scissor jack
New Fasteners Required:
•
Cable tie (quantity: 2)
Removal
1.
PERFORM LOCKOUT PROCEDURE:
2. Remove high voltage DCDC and CONT fuses.
High Voltage Fuses, page 70.1.
3. Unbolt the negative battery terminal eyelet.
Cover eyelet with insulating material. Use
cable tie to secure negative battery wire to the
positive battery cable. See
CAUTION:
Cover/protect battery terminal
eyelet to reduce the risk of accidentally
contacting the negative battery terminal,
which can inadvertently power up the
12 volt system and damage components.
CAUTION:
Secure battery terminal wire to
reduce the risk of arcing and damaging
electrical components.
4. Safely support motorcycle on motorcycle
stand.
5. Remove headlight upper fairing. See
Summary of Contents for SR/S
Page 2: ......
Page 10: ...2 4 General Information ...
Page 68: ......
Page 90: ......
Page 178: ......
Page 210: ......
Page 289: ...Electrical Main Bike Board MBB 70 41 70 ...
Page 290: ......