Power Pack
Power Pack
20-9
20
16. Remove bolts (x2) securing the bottom
connector of the BMS. Collect washers (x2).
Tool: T20. Torque: 12 in-lb (1.36 Nm).
Note: If plastic connector cover is loose,
remove it.
17. Remove bolts (x2) securing the upper
connector of the BMS. Collect washers (x2).
Tool: T20. Torque: 12 in-lb (1.36 Nm).
Note: If plastic connector cover is loose,
remove it.
18. Remove bolts (x7) securing the BMS to the
power pack. Collect flat washers (x6) and star
washer (x1). Tool: T20. Torque: 12 in-lb
(1.36 Nm).
Note: Discard BMS attaching bolts and
washers. Replace attaching bolts and washers
upon installation.
19. Remove BMS.
Installation
1. Installation is the reverse of the removal
procedure, with the exception of the following:
Summary of Contents for SR/S
Page 2: ......
Page 10: ...2 4 General Information ...
Page 68: ......
Page 90: ......
Page 178: ......
Page 210: ......
Page 289: ...Electrical Main Bike Board MBB 70 41 70 ...
Page 290: ......