20-8
Power Pack
Power Pack
20
11. Remove bolts (x2) securing the middle of the
front cover to the left side of the power pack.
Bolt: M5x10. Tool: T20. Torque: 18 in-lb
(2.3 Nm).
CAUTION:
Be very careful with the bolt
lengths during installation.
12. Remove bolts (x2) securing the middle of the
front cover to the right side of the power pack.
Bolt: M5x10. Tool: T20. Torque: 18 in-lb
(2.3 Nm).
CAUTION:
Be very careful with the bolt
lengths during installation.
13. Remove front cover.
14. Disconnect BMS signal harness connector.
15. Move BMS signal harness connector up.
Summary of Contents for SR/S
Page 2: ......
Page 10: ...2 4 General Information ...
Page 68: ......
Page 90: ......
Page 178: ......
Page 210: ......
Page 289: ...Electrical Main Bike Board MBB 70 41 70 ...
Page 290: ......