70-14
Lighting
Electrical
70
7. For the rest of this procedure, there will be
references to shouldered-bolts securing body
panels, that are 2 different lengths.
Short bolts
: designated on photos with
orange arrows, used to attach a single body
panel layer.
Long bolts
: designated on photos with blue
arrows, used to attach 2 layers of body panels.
Note: Non-shouldered body bolts designated
with green arrows are present in this
procedure.
8. Remove
long
bolts (x2) securing bottom of
right outer side fairing to bodywork. Tool: T25.
Torque: 3 lb-ft (4 Nm).
9. Remove
long
bolts (x2[blue arrows]) and
short
bolts (x2[orange arrows]) securing the
leading edge of the right outer side fairing to
bodywork. Tool: T25. Torque: 3 lb-ft (4 Nm).
Note: Take note of length of the bolts.
10. Remove right outer side fairing.
11. While removing right outer side fairing, guide
the right front turn signal harness wires
through their access hole in the right inner
side fairing.
Summary of Contents for SR/S
Page 2: ......
Page 10: ...2 4 General Information ...
Page 68: ......
Page 90: ......
Page 178: ......
Page 210: ......
Page 289: ...Electrical Main Bike Board MBB 70 41 70 ...
Page 290: ......