25-8
Chargers
Charging System
25
6. Remove left and right inner side fairings. See
Side Fairings (Inner), page 60.19.
7. Remove tank assembly. See
8. Disconnect MBB harness connectors (x2).
9. Squeeze tabs to release OBDII connector from
tank storage liner.
10. Disconnect USB power hub harness
connector.
11. Remove bolts (x2) securing tank storage liner
to storage liner support. Tool: T27. Torque:
2.5 lb-ft (3 Nm).
Note: During installation, do not snug storage
liner bolts until tank is installed.
12. Remove tank storage liner.
13. Release harness connector anchor from
charger port stand.
14. Remove bolts (x4) securing charger port
stand. Tool: T30. Torque: 7.6 lb-ft (10 Nm).
Summary of Contents for SR/S
Page 2: ......
Page 10: ...2 4 General Information ...
Page 68: ......
Page 90: ......
Page 178: ......
Page 210: ......
Page 289: ...Electrical Main Bike Board MBB 70 41 70 ...
Page 290: ......