Power Pack
Power Pack
20-33
20
Installation
1. Installation is the reverse of the removal
procedure except for the following:
2. Renew discarded zip ties.
Top Cover [22MY Onwards]
CAUTION:
Always perform the High Voltage
Discharging procedure prior to servicing any
High Voltage component or connection. Proper
procedures must be followed! To protect
electrical components, perform the following
tasks in the order given. Do not deviate from the
repair procedure processes.
NOTICE:
Before carrying out any work on the
electrical system, remove the key from the key
switch.
Removal
1. Remove 6kW charger. See
2. Remove rear cover. See
3. Remove BMU. See
(BMU) [22MY Onwards], page 20.14.
4. Remove bolts (x4) securing inner top cover.
5. Remove inner top cover.
Note: This will allow the release of the captive
charge inlet harness.
Summary of Contents for SR/S
Page 2: ......
Page 10: ...2 4 General Information ...
Page 68: ......
Page 90: ......
Page 178: ......
Page 210: ......
Page 289: ...Electrical Main Bike Board MBB 70 41 70 ...
Page 290: ......