45-20
Brakes
Brakes
45
9. Remove bolts (x2) securing left side of front
closeout panel to frame. Tool: T25. Torque:
3.5 lb-ft (5 Nm).
Note: Protect rear portion of front fender and
front closeout panel surfaces to reduce the
possibility of scratching their surfaces.
10. Remove bolts (x2) securing right side of front
closeout panel to frame. Tool: T25. Torque:
3.5 lb-ft (5 Nm).
11. Remove front closeout panel.
12. Remove bolt securing the front WSS harness
cushion clamp and front brake hose. Tool:
T30. Torque: 5 lb-ft (7 Nm).
13. Unhook retaining clip to release tension on
harnesses.
14. Cut cable ties (x2) securing CCM to the HCU
bracket.
Note: Replace cable ties (x2) during the
installation process.
15. Set CCM aside to gain access to key switch
harness connector.
Summary of Contents for SR/S
Page 2: ......
Page 10: ...2 4 General Information ...
Page 68: ......
Page 90: ......
Page 178: ......
Page 210: ......
Page 289: ...Electrical Main Bike Board MBB 70 41 70 ...
Page 290: ......