User Manual 3PH HYD5000-HYD20000-ZSS
Rev. 1.1 16/03/2021
Identification: MD-AL-GI-00
Rev. 1. of 16/03/2021 - Application: GID
47/138
Figure 46 - Communication connections between battery towers
The inverter and the HV BOX must be connected by populating the CAN2-A input with the Inverter-HV
BOX communication cable. The other end, in which only the “orange” and “white-orange” wires are
present, must be wired to the quick-connect COM connector of the hybrid inverter, as shown in the
figures below.
The HV BOX must be grounded using the M5 screw terminals supplied.
Figure 53 - Inverter/HV BOX communication cable
Figure 47 - Section of inverter connections