![YASKAWA E-II SGM H Series User Manual Download Page 35](http://html1.mh-extra.com/html/yaskawa/e-ii-sgm-h-series/e-ii-sgm-h-series_user-manual_3266058035.webp)
Installation
2.2.6 Voltage Resistance Test
2 -10
2.2.6 Voltage Resistance Test
WARNING
!
D
After voltage resistance test, wait at least five minutes before servicing the product.
Failure to observe this warning may result in electric shock.
Conduct voltage resistance tests under the following conditions.
D
Voltage:
1500 V rms AC. for one minute
D
Braking current:
30 mA or more
D
Frequency:
50 or 60 Hz
D
Voltage applied points
For SGDH-
AE Servopacks: Between the frame ground and the point where the
terminals L1, L2, L3, L1C, L2C, U, V, and W connect.
For SGDH-
DE Servopacks: Between the neutral ground terminal and the point where
the terminals L1, L2, L3, U, V, and W connect.
2
AUDIN - 7 bis rue de Tinqueux - 51100 Reims - France - Tel : 03.26.04.20.21 - Fax : 03.26.04.28.20 - Web : http: www.audin.fr - Email : [email protected]