7-52
Camshaft
0
1
2
3
4
5
6
7
8
9
10
A
17. Check that the “II” marks
g
on the VCT
assembly (PORT) and driven sprocket
(PORT) are aligned.
18. Check that the “I” marks
h
on the VCT
assembly (STBD) and driven sprocket
(STBD) are aligned.
19. Turn the crankshaft clockwise 60°
gradually until the large “
L
” mark
k
on
the crankshaft is aligned with the rib
m
on the cylinder block.
NOTICE:
Do not
turn the crankshaft clockwise more
than 60°. Otherwise, the pistons and
valves could collide with each other
and be damaged.
20. Install the cylinder head covers
w
and
x
.
21. Install the spark plugs, and then tighten
them to the specified torque.
22. Install the ignition coils.
Sheave holder
v
: 90890-01701
VCT cap
u
: 32 N·m (3.2 kgf·m, 23.6 ft·lb)
u
t
u
v
g
PORT
h
STBD
Spark plug: 28 N·m (2.8 kgf·m, 20.7 ft·lb)
60°
k
m
w
x
Summary of Contents for F225F
Page 1: ...SERVICE MANUAL 6CE 28197 3N 11 F L 225F F L 250D F L 300B ...
Page 4: ......
Page 54: ...1 31 SPEC Specification MEMO ...
Page 89: ...2 34 Lower unit 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 263: ...6 28 Canister 0 1 2 3 4 5 6 7 8 9 10 A j k f b ...
Page 477: ...8 98 Shimming counter rotation model 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 537: ...9 58 PTT cylinder 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 562: ...A 1 MEMO ...
Page 565: ......
Page 566: ...May 2010 1 ABE E_1 YAMAHA MOTOR CO LTD ...
Page 576: ...A 13 ...