6-26
Canister
0
1
2
3
4
5
6
7
8
9
10
A
Removing the canister
1.
Disconnect the vapor gas hoses
a
,
b
and
c
.
2.
Remove the vapor gas hose
a
from the
holders
d
.
3.
Disassemble the vapor gas hose
a
.
4.
Remove the canister
e
.
Checking the canister
1.
Check the canister. Replace if cracked.
2.
Connect the special service tool
a
to the
atmospheric port
a
and block the other
ports using rubber plugs
b
.
3.
Apply the specified positive pressure and
check that there is no air leakage.
Replace the canister if there is air
leakage.
Checking the canister check valve
1.
Connect the special service tool
a
to the
canister check valve port.
a
c
b
a
d
d
a
Vacuum/pressure pump gauge set
a
:
90890-06756
Specified positive pressure:
19.6 kPa (0.196 kgf/cm
2
, 2.8 psi)
e
b
a
a
Summary of Contents for F225F
Page 1: ...SERVICE MANUAL 6CE 28197 3N 11 F L 225F F L 250D F L 300B ...
Page 4: ......
Page 54: ...1 31 SPEC Specification MEMO ...
Page 89: ...2 34 Lower unit 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 263: ...6 28 Canister 0 1 2 3 4 5 6 7 8 9 10 A j k f b ...
Page 477: ...8 98 Shimming counter rotation model 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 537: ...9 58 PTT cylinder 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 562: ...A 1 MEMO ...
Page 565: ......
Page 566: ...May 2010 1 ABE E_1 YAMAHA MOTOR CO LTD ...
Page 576: ...A 13 ...