6-24
Throttle body
0
1
2
3
4
5
6
7
8
9
10
A
5.
Connect the pressure regulator hose
b
and vapor gas hose
a
.
6.
Install a new gasket
l
and the throttle
body
m
. Check that the tab on the gasket
l
is properly and firmly fitted into the
groove
a
in the surge tank.
NOTICE:
Do not reuse a gasket,
always replace it with a new one.
7.
Fasten the cooling water hose
n
using
the holder
o
.
8.
Connect the air pressure sensor hose
c
,
and then install the air pressure sensor
p
.
9.
Install the low-pressure pump coupler
b
and YDIS coupler
c
.
10. Connect the ETV coupler
d
and air
pressure sensor coupler
e
.
j
i
k
h
a
b
l
a
m
n
o
p
c
b
c
d
e
Summary of Contents for F225F
Page 1: ...SERVICE MANUAL 6CE 28197 3N 11 F L 225F F L 250D F L 300B ...
Page 4: ......
Page 54: ...1 31 SPEC Specification MEMO ...
Page 89: ...2 34 Lower unit 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 263: ...6 28 Canister 0 1 2 3 4 5 6 7 8 9 10 A j k f b ...
Page 477: ...8 98 Shimming counter rotation model 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 537: ...9 58 PTT cylinder 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 562: ...A 1 MEMO ...
Page 565: ......
Page 566: ...May 2010 1 ABE E_1 YAMAHA MOTOR CO LTD ...
Page 576: ...A 13 ...